Quarry Dig Seasons
A quarry season begins months before the first shovel turns soil. We start with a survey layout that ties every excavation unit to a documented grid, then configure the field data system so that locality numbers, stratigraphic notes, and recovery coordinates are captured at the moment a specimen is lifted. The kit includes rugged tablets, a local server that operates without cellular signal, and a simple synchronisation routine that runs when the crew returns to the lab.
Our team also produces the season paperwork: permission tracking, daily log templates, photo naming conventions, and a closing report that lists every unit opened, every specimen removed, and every context recorded. If a site is remote for weeks at a time, we build the solar and battery plan for the hardware as well. The aim is that a crew of four can run a clean season without carrying a filing cabinet into the desert.
- Grid survey layout and locality code assignment
- Offline field server, tablets, and battery plan
- Daily log templates and photo naming standards
- End of season reconciliation report